STAGE 04 · L-34 · 6 h 48 min
Pitched Roof Coverings Explained: Battens, Membranes and Tiles
“I order the roof work and sign it off without really knowing what I am looking at.”
SPEC · 04-1
The layers of an external thermal insulation system, starter tracks, adhesive patterns, anchors, reinforcement mesh, window reveals, and thin-coat render, in the order they go on.
“We insulate facades every summer, and I want to know why some of them crack and some do not.”
SPEC · UNITS
6 units · 38 lessons · 8 h 14 min
Each layer is drawn to the number of lessons in it.
TOOLBOX
Facade crews, site leads and owners commissioning an insulated facade who want to judge the work.
Streamed video lessons, watched online, for 20 months from the day access starts. A computer, tablet or phone with an internet connection is enough. The videos stream; they are not downloaded. Access details arrive by email within one working day of payment.
No. These are recorded lessons with no live trainer, no marking of your work and no certificate or qualification. It explains the work and shows it done; it does not replace any training your employer or national rules require.
38 lessons in 6 units, 8 h 14 min of video in total. The breakdown is in the layer diagram above.
STAGE 04 · L-34 · 6 h 48 min
“I order the roof work and sign it off without really knowing what I am looking at.”
STAGE 01 · L-29 · 5 h 48 min
“I go up a ladder twice a day and nobody ever showed me how to judge whether it is the right one.”